
Add to Cart
Cold Rolled Steel Prices / Gi Coil/Hot Dipped Galvanized Steel Coil
Good mechanical properties
The production process of cold rolled steel coil is complicated,which needs to go through many links such as pickling, quenching and finishing.
it has high strength and clasticity, so it is widely used in the manufacture of auto parts, mechanical equipment and building materials.
Decorative and rust resistant
The cold rolled steel coil has smooth surface,no oxide skin and burr, and has good decorative and rust resistance.
Higher precision
The cold-rolled coil product size is accurate,the thickness is uniform, and the thickness difference of the coil is generally not more than
0.01-0.03mm orsmaller,which can fully meet the requirements of high-precision tolerances.
The fine scale is thinner
The thinnest cold rolling can be rolled 0.001mm
|
Baodu was established in January 2010 with the office in Beijing and factory in Hebei, China.
Baodu is a designer, manufacturer, supplier and exporter of acoustic sandwich panel, insulated metal panel, profiled steel sheet, perforated metal sheet, steel structure and warehouse.
Baodu has the patented and customized double connection sandwich panel production line and imported steel plate bending machines from Swiss land and Germany.
Baodu has an annual output of 6 million square meters of acoustic sandwich panels,100000 tons of steel structures and 1 million square meters of profiled steel sheet.
Baodu has a professional design team with more than 10 years’ experience, including 5 senior engineers,20 engineers, and 35 technicians. Baodu has over 70 intellectual property rights, More than 30 registered trademarks, CE certification and Russian GOST certification etc.
Baodu have successively served key projects in in Dubai, Mongolia, Philippine, Mexico, US , Australia,Iraq, etc. the key projects is as below : Mongolia MCS Group Gold Mine Project; Philippines Malivans 2x330MW Coal-fired Power Plant Project; China Eastern Airlines Maintenance Warehouse Project of Beijing Daxing Airport
; Iraq Basra Gas Turbine Combined Cycle Power Plant Expansion Project; Dubai Hasyan 4*600MW clean coal-fired power plant project
FAQ:
Q1: What is your terms of payment?
A: 30% T/T in advance, the balance 70% before delivery. We will show you the photos of products and package before you pay the balance.
Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU
Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit. For production period,it usually takes about 15 days-30 days after receiving the deposit.
Q5: Could you provide the samples?
A: yes, we could provide the free samples on conditons it is available in stocks, however, the the transportation fee is borne by buyer.
Our advantages :
Optimized Material,Good Wear Resistance,Long Service Life
24 Hours Online,Professional Team, To Provide Better Service
Support Customization, Can Be Made According To Customer Needs
Have Long-term Cooperation With Freight Forwarding Company Fast Delivery